Category: Construction

  • Construction Question

    please see the file for the requirments

  • CPCCOM1013 Plan and organise work.

    Don’t write long answers. One sentence explanation

  • CPCCOM1013 Plan and organise work

    Keep your answers short to moderate (not long).

  • CPCCOM1013 Plan and organise work

    Keep your answers short to moderate (not long).

  • CPCCOM1013 Plan and organise work

    Keep your answers short to moderate (not long).

  • cost proposal

    Assignment 2: Construction Takeoff and Cost Proposal

    In this assignment, you will perform a construction takeoff analysis for a multi-level hotel building project. The goal of this exercise is to simulate a real-world estimating scenario in which a contractor prepares a cost proposal for a client based on architectural drawings.

    Using the architectural drawings provided for the hotel project (see attachment), each team will complete a quantity takeoff for the following building components:

    • Flooring
    • Walls
    • Windows
    • Doors

    Your team will use these quantities to develop a cost estimate and proposal for the project owner.

    Scope of the Assignment

    Your final submission should take the form of a professional cost proposal prepared by a fictional construction firm. The proposal should include the following:

    1. Cost Estimate
    • Quantity takeoffs for doors
    • Unit costs and total cost calculations
    1. Risk and Contingencies
    • Identification of potential risks in the project
    • Appropriate contingency allowances included in the estimate
  • Discussion- LMRAD format

    • The IMRAD format is widely known for its straight forwardness in research writing. Other variations of this format also exist such as IRDAM, IMRADC, and ILMRAD. Provide your experience using any of these method variations. Include your preference for a specific format and explain why that format is most effective in your view. If available, cite previous papers that you have created using your preferred writing methodology.
  • Construction Question

    Introduction to Procore

    Using Procores online Project Manager: Project Management module (), you are required to develop an implementation plan for implementing a cloud-based collaboration tool for site management on your project.

    Assume you are the project manager for a general contractor constructing a new commercial building in the town center.

    The paper should be 3 pages (double-spaced, APA style) and written for the division head of your organization to obtain authorization for implementation.

    As an appendix, attach the completion certificate from Procores education website.

    The title page and appendices are not included in the three-page limit.

  • Construction Question

    Do all the questions be neat and organized

  • HW 8- Capillary Action in Soil dissected

    HW 8- Capillary Action in Soil dissected

    Capillary action dissected

    Read the article and watch the videos on Capillary Rise in Soil, and Submit a summary report of your readings and observations: (at least 2 pages 600 words)

    Read the article and watch the videos on Capillary Rise in Soils

    *******************************************

    Videos:
    Capillary action dissected

    Capillary Rise in Soils