Category: Construction

  • Discussion- LMRAD format

    • The IMRAD format is widely known for its straight forwardness in research writing. Other variations of this format also exist such as IRDAM, IMRADC, and ILMRAD. Provide your experience using any of these method variations. Include your preference for a specific format and explain why that format is most effective in your view. If available, cite previous papers that you have created using your preferred writing methodology.
  • Construction Question

    Introduction to Procore

    Using Procores online Project Manager: Project Management module (), you are required to develop an implementation plan for implementing a cloud-based collaboration tool for site management on your project.

    Assume you are the project manager for a general contractor constructing a new commercial building in the town center.

    The paper should be 3 pages (double-spaced, APA style) and written for the division head of your organization to obtain authorization for implementation.

    As an appendix, attach the completion certificate from Procores education website.

    The title page and appendices are not included in the three-page limit.

  • Construction Question

    Do all the questions be neat and organized

  • HW 8- Capillary Action in Soil dissected

    HW 8- Capillary Action in Soil dissected

    Capillary action dissected

    Read the article and watch the videos on Capillary Rise in Soil, and Submit a summary report of your readings and observations: (at least 2 pages 600 words)

    Read the article and watch the videos on Capillary Rise in Soils

    *******************************************

    Videos:
    Capillary action dissected

    Capillary Rise in Soils

  • Report and proposal for site layout

    Write the report as you are part of a team from LUS Contracting bidding for the North West Leeds Car Park Project. Your task is to write a 1200-word group project report that acts as your initial site setup proposal. This isn’t just a description; it’s a persuasive document to show ICP (the client) that you are competent, safe, and innovative.

    You need to propose two key things:

    1. Site Establishment Plan: How you will set up the site (access, security, cabins, material storage, plant).
    2. Traffic Management Plan: How you will manage construction traffic and segregate it from the public and your workers.

    Crucially, you must illustrate these plans on up to two detailed, Computer-generated (AutoCAD), marked-up site plans that show how the setup changes during different phases of construction.You need to be aware of construction site system in UK

  • Construction 4.0

    Develop an outline of the implementation plan for your selected construction company based in Boston to implement Construction 4.0 and Industrialized Construction in their project management functions. Your implementation plan must answer the following questions:

    1. Why should the company adopt Construction 4.0?
    2. What are the critical components of the proposed implementation?
    3. How will the implementation take place?

    In addressing these high-level questions, you can also consider these additional questions:

    1. What pain points and inefficiencies will be addressed?
    2. What use cases will be implemented, and how will these be prioritized?
    3. What are the training and reskilling needs?
    4. What are the challenges to implementation?
    5. What are the benefits of implementation, and how will these be realized?

    The assignment is a group assignment, I have listed the outline for my part (the screenshot), write a script for ppt for me (total 5 slides), the company we choose is

    3. J.C. Cannistraro

    Based near Boston (Watertown, MA) and utilizes progressive construction tech and modern prefabrication capabilities a key part of industrialized construction.

    Their incorporation of prefabrication and digital construction workflows aligns well with both Industrialized Construction and digitization strategies.

  • discussion

    Construction industry projects are particularly known to significantly exceed original budget estimates. Explain why you think this happens. What should you, as a project manager, do to reduce the amount of these overruns? Can technology help to manage the variance between budgeted and actual costs? Why or why not? If it can, how?

    Remember to find strong, reliable references and cite them in your initial post. Respond to at least two other students initial posts, again citing references for your perspective that adds value to their posts.

  • CM208 Construction Site Surveying Homework #6

    Problem 1

    Given points:

    A(N1200, E1850), B(N2100, E2875), C(N1900, E4000).

    We treat coordinates as (x=Easting, y=Northing):

    A(1850,1200), B(2875,2100), C(4000,1900)

    We use the circumcenter formulas:

    D = 2[x1(y2-y3)+x2(y3-y1)+x3(y1-y2)]

    Plug in:

    D = 2[1850(2100-1900)+2875(1900-1200)+4000(1200-2100)]

    D = 2[1850(200)+2875(700)+4000(-900)]

    D = 2[370000 + 2012500 – 3600000]

    D = 2[-1217500] = -2435000

    Compute Ux:

    Ux = (1850^2+1200^2)(2100-1900)+(2875^2+2100^2)(1900-1200)+(4000^2+1900^2)(1200-2100) / D

    Compute each piece:

    1850^2+1200^2 = 3422500

    2875^2+2100^2 = 13015625

    4000^2+1900^2 = 19761000

    Now plug:

    Ux = [3422500(200) + 13015625(700) + 19761000(-900)] / -2435000

    Ux = (684500000 + 9110937500 – 17784900000) / -2435000

    Ux = -8039475000 / -2435000 = 3204.748

    Now Uy:

    Uy = [3422500(4000-2875)+13015625(1850-4000)+19761000(2875-1850)] / D

    Compute:

    4000-2875=1125, 1850-4000=-2150, 2875-1850=1025

    Uy = [3422500(1125) + 13015625(-2150) + 19761000(1025)] / -2435000

    Uy = (3840312500 – 27983671875 + 20253075000) / -2435000

    Uy = -3890284375 / -2435000 = 690.773

    Radius using point A:

    R = sqrt[(3204.748-1850)^2 + (690.773-1200)^2]

    R = sqrt[1354.748^2 + (-509.227)^2]

    R = sqrt(1834036 + 259307) = sqrt(2093343)

    R = 1447.293 ft

    Final Answers:

    O(N=690.773, E=3204.748), R = 1447.293 ft

    Problem 2

    Points:

    A(350,450), B(875,850), C(1100,200)

    AB

    N = 875 – 350 = 525

    E = 850 – 450 = 400

    AB = sqrt(525^2 + 400^2) = sqrt(275625 + 160000)

    AB = sqrt(435625) = 660.019 ft

    Bearing:

    = tan^{-1}(400/525) = 37.3039

    Bearing AB: N 37.3039 E

    BC

    N = 1100-875 = 225

    E = 200-850 = -650

    BC = sqrt[225^2 + (-650)^2] = sqrt(50625 + 422500)

    BC = sqrt(473125) = 687.841 ft

    Bearing:

    = tan^{-1}(650/225) = 70.9065

    Bearing BC: N 70.9065 W

    Problem 3

    Given:

    PVI = Sta 8+00, Elev = 310.50

    g1 = -1.5% = -0.015, g2 = +2.0% = 0.02

    L = 7 stations = 700 ft

    a = (g2 – g1) / 2L = [0.02 – (-0.015)] / 1400

    a = 0.035 / 1400 = 0.000025

    BVC station:

    BVC = 8+00 – 3.5 = 4+50

    Elevation at BVC:

    z_BVC = 310.50 – (-0.015)(350) – 0.000025(350^2)

    z_BVC = 310.50 + 5.25 – 3.0625 = 312.6875 ft

    Elevation at Sta 7+10

    x = 710 – 450 = 260 ft

    z = 312.6875 + (-0.015)(260) + 0.000025(260^2)

    z = 312.6875 – 3.90 + 1.69 = 310.4775

    Elevation at 7+10 = 310.478 ft

    Lowest Point

    x_LP = -g1 / 2a = 0.015 / 0.00005 = 300 ft

    Station LP = 450 + 300 = 750 = 7+50

    z_LP = 312.6875 – 4.50 + 2.25 = 310.4375

    LP Elevation = 310.438 ft

    Problem 4

    Given:

    VPI = Sta 87+25, Elev = 115.78

    g1 = -3.5% = -0.035

    g2 = +2.8% = 0.028

    Obstruction = Sta 90+35, Elev = 152.39

    Clearance = 20 ft

    We use L = 620 ft so obstruction is exactly at EVC.

    Thus:

    BVC = 87+25 – 3+10 = 84+15

    EVC = 87+25 + 3+10 = 90+35

    Compute a:

    a = [0.028 – (-0.035)] / [2(620)]

    a = 0.063 / 1240 = 0.000050806

    Elevation at BVC:

    z_BVC = 115.78 – (-0.035)(310) – a(310^2)

    z_BVC = 115.78 + 10.85 – 4.8829 = 121.7471

    Elevation at EVC:

    z_EVC = 121.7471 + (-0.035)(620) + a(620^2)

    z_EVC = 121.7471 – 21.70 + 19.4775 = 119.5776

    Lowest Point

    x_LP = -(-0.035) / 2a = 0.035 / 0.000101612

    x_LP = 344.5 ft

    Station LP = 84+15 + 344.5 = 87+59.5

    z_LP = 121.7471 – 0.035(344.5) + a(344.5^2)

    z_LP = 121.7471 – 12.0575 + 6.028 = 115.7176

    LP = Sta 87+59.5, Elev = 115.718 ft

  • HW 7- Effective Stress

    Review Chapter7- The Effective Stress , and complete problems 7.1, 7.2, 7.3 which are located at the end of the chapter.

    [Soil Mechanics Fundamentals and Applications
    Second Edition, Isao Ishibashi Hemanta Hazarika]

  • Accident Causation

    Based on the fall accident case attached, analyze the root cause of the accident with system diagram. Submit a pdf file (up to 2 pages) that include the system diagram and answers for the questions below:

    Step 1. Identify at least 15 variables that influence fall risk on this project. Variables should include four levels: risk perception (individual level), field presence (supervisory level), production pressure (organizational level), guardrail coverage (environmental level). Each level should include at least 3 variables. Avoid vague variables (e.g., safety problem, bad management). Good variables are measurable and/or conceptually clear. List them according to each level.

    Step 2. Build causal loop diagram. Construct a causal loop diagram that:

    • Shows directional arrows
    • Include polarity (+/-)
    • Contains at least 2 reinforcing loop
    • Contain at least 1 balancing loop

    Example of reinforcing loop: Production Pressure (+) Rushing Behavior (+) PPE Non-Compliance (+) Incident Probability (+)

    Example of balancing loop: Incident (+) OSHA Fall Protection Enforcement (+) Fall Risk (-)

    Step 3: Identify and explain feedback loops. Select one loop and do the following:

    • Name it (e.g., “Schedule Pressure Loop)”
    • Explain how it operates
    • Explain how it contributed to the accident
    • Discuss whether it stabilizes or destabilizes the system

    Step 4: Based on the system diagram, answer in 200 words.

    Q: Why do organizations repeatedly fail at fall protection despite clear OSHA regulations?

    Use attached lecture slides and case study for your reference.