This weeks assignment will introduce you to Planview Projectplace, a tool used throughout the world by organizations to manage projects. If you have not used ProjectPlace in a different class already, please be sure to watch the videos introducing you to the software and how to use the different features.
Note if you have not already, please follow the steps in week 1 for requesting access to Planview ProjectPlace. After you request access, you will be e-mailed instructions to set up an account. Follow the prompts to establish a password. Remember, any support you need with logging in or with the software should be done via
- For this project, be sure to follow all the instructions carefully as well as review all the videos (including the assignment video specific to this assignment). You will create a project in ProjectPlace and begin building a WBS (including the execution deliverables you had from your prior discussion). Note do not re-use a project from another course. Be sure each course you create unique projects as to not plagiarize your past work.
- Log into using your school e-mail and the password you created. The lo
- Watch the following videos:
- Introducing
- Project Assignment 1 Video
- Review the following text instructions:
- Next create a Workspace.
- From the My Overview page, scroll down to the Workspaces section and choose Create
- Choose the template UniversityPPM Template
- For the name of the project populate your full name then hyphen your course code
- (Example: Alivia Smithson – BADM-636)
- Populate the current date in the Project Start Date field
- In the Department field, choose the applicable course you are in
- This should open up a new Workspace screen. If not choose Workspaces from the top Menu to open it up.
- Directly under the Project Name (your name), under where it says Short Description – click in there and write 2-3 sentences describing the purpose/scope of your project (in essence a scope statement based on the project you selected in step 1 above). You may also upload a custom avatar if you wish.
- Next click on Members on the top menu, Click invite. Search for your course instructor and add them as a member by clicking Send.
- Congratulations you have now created a project workspace! Feel free to familiarize yourself with the different areas of the workspace!
- Next, we are going to add in our project WBS. (Be sure to follow the steps in the assignment video which include):
- Navigate to the Plan page to add in deliverables/activities
- Adding your project as the first line to your Plan.
- Add in the major deliverables under your project as initiate, planning, execute, monitor/control, and close.
- Under Initiate, add in one (1) sub-deliverable
- Under Planning, add in at least five (5) sub-deliverables
- Under Execution, add in the deliverables based on your prior discussion post. Expand on them if applicable so that you have at least five (5) sub-deliverables under Execution.
- Under each of your sub-deliverables, add at least two activities per deliverable, which is the action of the work needing to be completed.
- At this time, you do not need to add sub-deliverables for the monitor/control and close deliverables.
- Next add in dependencies for all the activities (note you only have to add these into any activity that doesnt have sub-activities). When you do this, create at least two of your deliverables to be completed in parallel. Be sure all activities except the first have a predecessor and all have a successor. You can check this by making sure all work packages have an arrow going into and out of them. Change the color of the parallel activities to the color purple to make them standout from other activities.
- Next update your durations so that your project is four months long. If your actual project was more/less, just adjust for the purpose of the assignment so your total project is exactly four months long (120 days).
- Finally, take a screen snip of your WBS and of the Gantt chart created. Add these within a word document and submit them to your instructor for grading. Note be sure the WBS/Gantt chart is fully expanded and the duration and start dates are viewable. You may need to take multiple screen shots if needed.