Unlimited Attempts Allowed
This final project has been designed to examine your understanding for project scheduling and controls.
Background:
A small project with multiple activities has been created that need your help organizing the schedule. The Excel sheet linked above has all the project information that was gathered from your manager. Follow the steps listed in on the Excel sheet and complete the requested steps. Review your past activates to help guide you through each step.
You will be asked multiple questions about this project in the final quiz!
Task:
With your understanding of project scheduling complete the four (4) steps out lined on the Excel starter file above.
Note STEP THREE and STEP FOUR are on the second tab in the Excel sheet.
Delivery Method:
Upload the Excel file when completed
Save your files as: FINAL_Lastname
Result:
Once completed you should have a network diagram, a bar chart, a resource loaded chart, and also have calculated schedule variances that will help you answer the final quiz questions in Module #8.
Submitting your Assignment
- Find the “Choose a submission type” section at the bottom of this assignment page (if this section is not displayed, the submission type has been chosen for you). Choose your submission type from the options listed there.
- Complete the assignment for the chosen Submission Type.
- Click the Submit Assignment button to submit.
or contact your instructor if you need assistance.
BCOM 220 FINAL PROJECT
| Criteria | Ratings | Points |
|
File names |
5 pts 0 pts |
/5 pts |
|
All activities accounted for |
10 pts 0 pts |
/10 pts |
|
Sound Logic |
20 pts 0 pts |
/20 pts |
|
Diagram presentation |
10 pts 0 pts |
/10 pts |
|
Submission of file |
5 pts 0 pts |
/5 pts |